Trace materials from the drawing to the pipe section
An isometric piping drawing and a bill of materials accompany each production order. The operator scans the parts and records where each one is installed in the pipe section. The record includes the part number and batch number.
Access documentation during production and at handover
The project manager can retrieve the weld log while work is in progress. At handover, the component list identifies the material batches used, and the weld list brings together the inspection records.




















